The Transfer Station had to remain open during the entire project. Done in two Stages.
Scope: Demolition of existing timber retaining wall and construction of 3No. new bin bays, concrete footing and slabs, installation of 14No. Precast Panels with anchored tie rods, supply and installation of steel balustrade with gates and bin flaps to top of wall.